D5–D7: Corrective Actions & Prevention

Once the root causes are proven, the team moves to eliminating them permanently and updating quality documentation.

D5: Permanent Corrective Actions (PCA) Selection

  • Evaluation Matrix: Score candidate solutions based on technical feasibility, tooling costs, lead times, and potential side-effects.
  • Risk Assessment: Confirm that the proposed action introduces no new failure modes.
  • "Red Rabbit" Validation: For detection actions, document the challenge test strategy using known defective samples (Red Rabbit) used to validate the control.

D6: Implementation & Validation

  • Action Plan: Define exact implementation tasks, responsibilities, target completion dates, and tracking milestones.
  • Effectiveness Proof: Collect production data over a representative period (e.g. 3 consecutive batches or 30 days of production).
  • Containment Removal: Once statistical verification proves 0% defect recurrence, dismantle interim containment (D3) to avoid ongoing operational costs.

D7: Systemic Recurrence Prevention

True continuous improvement ensures similar lines or products benefit from lessons learned:

  • FMEA Updates: Revise Process / Design Failure Mode and Effects Analysis (PFMEA/DFMEA) severity, occurrence, and detection rankings.
  • Control Plans: Amend inspection frequencies and error-proofing (Poka-Yoke) controls.
  • Standard Operating Procedures (SOP): Update work instructions and retrain operators.

Cost Tracking & Monitoring

Remember to log all expenses associated with corrective actions (new tooling, mold rework, engineering hours, external lab testing, or contractor fees). Quality improvements are never free: systematically tracking costs enables accurate Cost of Poor Quality (COPQ) analysis, ROI evaluation, and rigorous financial monitoring.